From the master plan to the last site meeting

JSA provides services in all key areas of building procurement, from design and documentation through to contract administration and project management, for regional clients who want one practice to carry the project.

Waste Education Centre at Cosgrove, timber cladding under a steel canopy against open sky
Waste Education Centre, CosgroveCommercial and institutional

Murchison Pool: master plan to funding round

The pool is part of the fabric of a small rural community. The practice's work there shows the first three services in order, and what happens when the money is not yet there.

  1. 2014Engaged to master plan the upgrade of the Murchison Pool complex.
  2. 2019Engaged again for the detailed design and contract documents for stage 1: new amenities, kiosk, toddlers pool and a new slide.
  3. Dec 2019Documentation completed. Status as published: awaiting funding approval.
Design render of Murchison Pool stage 1
Design render of the Murchison Pool entry and amenities

Design renders by the practice.

Refurbished offices at Primary Care Connect, Shepparton
Timber screen in the Primary Care Connect refurbishment
Cardio rehab gym at Primary Care Connect

Primary Care Connect: three stages in a building that stayed open

Three buildings of different ages, joined by a first-floor extension in 2009, no longer coped with the services, staff and clients of a Shepparton primary and allied health provider. JSA refurbished it in stages around the people using it.

  1. 2016Work commences on upgraded offices and meeting rooms, counselling spaces and a new cardio rehab gym.
  2. Stage 3Foyer and staff amenities refurbished, with JSA administering the building contract.
  3. Feb 2020Stage 3 completed: a new front of house and identity, with access and function problems solved inside the existing fabric.

All key areas of the building procurement process

Master planning / design / documentation / contract administration / project management

Each link opens a project where that service was the work: the Murchison master plan, the Tatura Library wing, the staged court documents, the Primary Care Connect contract and the Irvin House works inside an occupied aged care home. The practice believes professional design applied to any project, no matter the size, adds value.

Six years of staged public work, drawn to time

Dates as published on the practice's project pages. Staging lets a building stay open and lets each step wait for its funding round.

Murchison Pool

  • 2014: Master plan
  • 2019: Detailed design and contract documents for stage 1
  • Dec 2019: Documents completed; awaiting funding approval

Primary Care Connect

  • 2016: Work commences
  • Feb 2020: Stage 3 completed

Maude Street amenities

  • 2017: Commenced
  • Jan 2020: Complete

Staging, access and funding

What councils, health services and school committees ask an architect, answered from JSA's own project notes.

Can building work be staged while our facility stays open?

Yes. The Benalla and Cobram court works were designed in stages so construction could go ahead while the courts stayed in operation. Irvin House aged care in Cobram was master planned in four stages within an occupied facility, and Primary Care Connect in Shepparton was refurbished in three stages from 2016 to 2020.

Our funding comes in rounds. Can the design be split to match?

That is how several JSA projects run. The Murchison Pool master plan was prepared in 2014; the detailed design and contract documents for stage 1 followed in 2019 and await funding approval. The Irvin House master plan lets each stage proceed as funding becomes available.

Does the practice design accredited accessible facilities?

Yes. The Maude Street amenities building in Shepparton includes an All Abilities facility designed and accredited under the Changing Places guidelines, with a full room coverage hoist and adjustable adult change table. The court projects delivered DDA upgrades and accessible WC facilities.

We have a heritage building. Will it be kept?

At Nagambie Primary School the upgrade restores the heritage-listed 1870s building to prominence, with new buildings set back so the old one leads. At the Cobram court the works met the site's heritage overlay.

How does JSA approach sustainable design on a tight budget?

Passive design first: orientation, cross ventilation, shading, insulation and draught sealing, then careful choice of materials, fixtures and construction methods, worked through with the services engineers because building services drive running costs. JSA also collaborated on Goulburn Valley Health's 10 Star Charity House.

Is our project too small for an architect?

The practice believes that professional design applied to any project, no matter the size, adds value for the client, users and stakeholders in function, quality and meeting cost targets. Its list runs from the Shepparton Senior Citizens WC and the $0.75M Maude Street amenities to the $3.0M Irvin House stage 1.

Sustainable design, project by project

Each project presents a different set of opportunities and constraints that set its approach to environmentally sustainable design.

Constraints such as budget call for a clever approach suited to the project type. Significant improvements often come from passive design and the careful selection of materials, fixtures and construction techniques. Building services have a major effect on energy use and running costs, so JSA works closely with the rest of the team to get the best result within the project budget.

In support of sustainable development, JSA collaborated on Goulburn Valley Health's 10 Star Charity House, a high star-rated home built to current best practice, with auction profits going to GVH.

Waste Education Centre at Cosgrove, timber-clad pavilion and steel canopy in open country

The passive design principles the practice starts from: orientation, cross ventilation, shading and light transmission, insulation, draught sealing, material selection and building form.

Call officeEnquire